Our Work

Our Projects

Kaleshwaram Project

  • Location : Telangana
  • Major Contractor : Megha Engineering  & Infrastructures Lmtd
  • Value of the Work : 44 Crores
  • Time Lines : 2017 to 2019

COT & 100mt. Bund Construction work in Ranganayaka Sagar Dam 9.0 lakhs CBM

Rock Pitching work for Sagar Dam 5.0 lakhs cbm

Chandlapur Package 11 Tunnel 11 Meter Dia, pump house surgible Mucking of blased rocks lifting and transporting 6.5 lakhs CBM.

Godavari Lift Irrigation

  • Location : Telangana
  • Major Contractor : Megha Engineering  & Infrastructures Lmtd
  • Value of the Work : 9 Crores
  • Time Lines : 2017 to 2020

Vertical Pump House Surgible 26.5 Meter Width 140 Meter Depth

Supply of Heavy duty Cranes & Drilling Equipment

Package 3, 5 & 10 6 meter Dia Tunneling and Mucking of blasted rocks and lifting, Transporting 4.3 lakhs cbm

Palamuru Ranga
Reddy Lift Irrigation

  • Location : Telangana
  • Major Contractor : Megha Engineering  & Infrastructures Lmtd
  • Value of the Work : 32 Crores
  • Time Lines : 2018 to Till Date

Hyderabad METRO
Project

  • Location : Telangana
  • Major Contractor :  L&T
  • Value of the Work : 6.3 Crores
  • Time Lines : 2012 to 2014

Hyderabad METRO
Project

  • Location : Odisha
  • Major Contractor : Gayatri Projects Pvt
    Ltd
  • Value of the Work : 14 Crores
  • Time Lines : 2019 to Till Date